Understand a property. Prepare the answers, through to signature.

Real estate advisory, transaction and project managementDiscover the method ↓France · November 2026

Sell, let, buy,
obtain approval for a project.
Prepare what binds the parties.

We gather the documents, spot what could hold the transaction back and decide how to deal with it: correct, verify, cost or negotiate. Then we organise the steps that condition what follows, through to the sale, the letting or the authorisation.

Neither mere analysis nor mere introductions. Advisory, transactions under a professional licence (carte professionnelle) and project management, across France and beyond.

Find your situation ↓

A point discovered too late costs more than months.

  • TimeEvery delay pushes back everything that follows: the review, the marketing, the signature.
  • MoneyThe property stays tied up, interest accrues, studies have to be redone or completed, consultations are repeated.
  • TrustA tenant, buyer or local authority that discovers a problem late doubts the rest. We present strengths and difficulties alike: what is established, what remains to be verified, and how each point will be handled.

Seven families, one method.

Rules, deadlines and counterparts differ between a hotel, a warehouse and a plot of land. The framework stays the same: understand the property, situate its constraints, schedule them.

  1. 01Hotel
  2. 02Business premises
  3. 03Offices
  4. 04Retail
  5. 05Residential
  6. 06Heritage
  7. 07Energy and infrastructure

A good file comes down to three moves.

  1. 01

    Understand.

    Every document is inventoried and sourced. What is established is kept apart from what remains to be confirmed, and every gap has a name: whoever holds the document.

  2. 02

    Situate.

    Every constraint finds its place on one of the five axes, with its answer: to correct, to verify, to cost or to negotiate.

  3. 03

    Schedule.

    Every step is placed in the timeline, with what it depends on and who leads it. You see what moves in parallel and what conditions what follows.

Five axes, and your timeline.

The questions are always the same. It is the answers that make the difference.

Planning
  • Building heights
  • Façade alterations
  • ABF (heritage architect)
  • DRAC (regional cultural affairs office)
Regulatory
  • Atout France star rating
  • ERP (public-access building)
  • Fire-safety commission
  • SDIS (fire and rescue service)
  • Hotel stock protection
Technical
  • Utilities and energy supply
  • Water
  • Swimming pool
  • Acoustics
Ownership and operation
  • Property (walls)
  • Going concern (fonds de commerce)
  • Operating company
  • Management or franchise agreements
Market and economics
  • Payroll
  • Average daily rate (ADR)
  • RevPAR
  • EBITDA (EBE)
  • Occupancy rate
  • Booking channels

For each family of property, we examine what planning rules allow, the obligations to comply with, the technical capacity of the site, the ownership and operating structure, and market conditions. This cross-reading identifies what may block the project, what must be confirmed and what can be negotiated, then measures the impact on the project, its budget and its timeline.

One property, not always the same timeline.

The same obstacles. But not the same delays, depending on whether they are anticipated or discovered too late.

The property
Industrial building let to a single occupier, on land that retains a buildable reserve.
The vision
Sell the let property as a whole, with the permit cleared of appeals on the reserve, within eighteen months.
Case study
Composed from situations encountered; no real file is described.
Obstacles strikeM0
VisionM18
Obstacles seen in advanceM0

Theoretical simulation: delays and setbacks in orders of magnitude, for illustration. Every file has its own timeline.

Useful time, obstacles dealt with beforehandUseful time, obstacles sufferedDelay sufferedDelay controlled
ObstacleIf it strikesIf seen in advance
1 · Articles of association and accounts
Ownership and operation
Discovered by the buyer during due diligence: renegotiation.+2 monthsUpdated, with a data room, before going to market.
2 · Lease expiring
Market and economics
Notice without renewal: the tenant stays in the premises until the eviction indemnity is paid, which it has two years to claim.+24 months, in parallelRenewal negotiated with a firm term, before the sale.
3 · Permit near a listed monument
Planning
Incomplete file: the planning office asks for further documents.+2 monthsProject presented to the planning office and the ABF before filing.
4 · Insufficient power
Technical
Connection requested once the permit is granted.+3 months, in parallel with the appealRequest filed while the permit is under review.
5 · PLU review
Planning
The PADD (sustainable development plan) debate has taken place: a stay of decision (sursis à statuer) is raised against the permit.+6 months, on the permit, documents includedPADD orientations read before filing: project adjusted, or timetable adapted to a possible stay.
6 · Posting and appeals
Regulatory
Two months after the permit is posted, a neighbour files a legal challenge.+12 monthsResidents and the town hall met beforehand, project adjusted. An appeal remains possible; its grounds are anticipated.+2 months, controlled
C · Check
Before the deed
—Double check of the six points before the deed is concluded.

We do not guarantee. We suffer less, and we limit the risk.

Four situations, each demanding the same level of preparation.

01You own a property.

We gather the documents, establish what the property allows and what blocks it, then decide how to deal with it. You choose what comes next knowing its conditions.

  • DeliverableSourced file, options, timeline
  • EndEvery question has a status
Present a property ↓
02You want to sell or let.

We prepare the file the buyer or tenant will examine, with answers to the sensitive points. Then we present it to targeted counterparties and run the negotiation through to signature, under a mandate.

  • DeliverableAsset file, data room, presentation
  • EndSignature, or expiry of the mandate
Give us a mandate ↓
03You are looking for a site.

We write your criteria in the same grammar as our property files, then qualify and compare sites on the same five axes. For each site, you know what remains to be resolved before you commit.

  • DeliverableSearch brief, sites compared
  • EndSite selected, or expiry of the mandate
Commission a search ↓
04You are carrying a project.

We organise the steps on which authorisation depends: coordinating contributors, dealings with local authorities and State services, a timeline kept up to date at every stage.

  • DeliverableProject management, up-to-date timeline
  • EndAuthorisation cleared of appeals, or agreed milestone
Discuss a project ↓

Deeds are drafted by the notary or lawyer, the project by the architect. Transactions under a professional licence, one mandate per property.

Do you receive files that you do not handle?Pass them on to us ↓

Your assets. Your projects.
Our conversation starts here.

A property, a project, a lingering question: write it the way you would say it. We read everything, then propose a conversation.

1 · Your property or project
You do not need to have all the answers to write to us.